Buffer Mitigation

 

Checklist

BUFFER MITIGATION / RESTORATION PLAN REQUIREMENT CHECKLIST

General information:
    Owners information (Name, Address, Phone)
    Brief summary
    Use corridor formula (frontage feet X 0.3)
    Proposed timeline for installation
    Pictures of site (if possible)

Map of sufficient scale showing:
    North arrow
    Existing structures, roads, driveways, utilities, etc.
    Existing ground cover
    Generic soil type (sandy, silty, clayey, mucky)
    Existing wetlands
    Distances, setbacks, and dimensions
    Approximate contour elevation lines or slope percentages

Same or additional map showing:
    Proposed construction including
o       Buildings
o       Roads
o       Decks, patios, gazebos
o       Paved areas
o       Steps
    Boat docks, slips, and piers
    Proposed vegetative changes (including dimensions)
    Proposed management changes (no mow, etc.)
    Proposed use corridors with dimensions

Restoration information:
    Common names of trees, shrubs, forbs, and grasses
    Age / height of trees
     Density of plantings
    Erosion control practices (for violation sites)